In May 2017, the intelligent drilling rig was successfully developed
-
March, 2016
Chongqing Pingshan Industrial Group Co., Ltd. was established in 2016
-
December 2015
In 2015, the national dividend mechanism was officially opened.
-
September 2014
In 2014, zdy series full hydraulic tunnel drilling rig was fully launched.
-
March 2011
In 2011, it was rated as a contract abiding and trustworthy enterprise by the State Administration for Industry and commerce.
-
June 2010
In 2010, it was rated as "high tech enterprise".
-
December 2008
In 2008, it was restructured into Chongqing Pingshan mining Electromechanical Equipment Co., Ltd.
-
October 2006
In 2006, the new plant was completed and the overall relocation was completed.
-
March, 2001
In 2001, it entered the coal mine electromechanical industry.
-
September 1998
In 1998, Chongqing Pingshan mining electromechanical equipment factory was established (the predecessor of Chongqing Pingshan mining Electromechanical Equipment Co., Ltd.).
地址版权
Time of issue:2018-08-27 00:00:00
Address:No. 600, Nanhu Road, Nanpeng Street, Banan District, Chongqing. Business Tel:+86-13808326609 / +86-13709402729 After Sales Tel:+86-13594203119
© 2021 Chongqing Pingshan Electromechanical Equipment Co., Ltd. All Rights Reserved. 渝ICP备10000247号-1 Powered by:www.300.cn
手机地址版权
Time of issue:2021-05-10 18:07:22
© 2021 Chongqing Pingshan Electromechanical Equipment Co., Ltd.
- Tel 023-66428866
- Tel
- Feedback
- Top